Sl. 2. Item No. : 18.1.1 (b) = Description of work should be read as :
Reinforcement over the playing areas within concrete floor over 2 sets of Badminton Courts
Total area – 2 sets of Badminton Courts
17.00 X 19.41 m = 330 Sq.m @ 4 Kg/Sq.m.
Other description of work will remain same.